Search Results

Results 1 to 25 out of 92

Name Type Description Download
AddMonthlyUtilityData Ruby measure Reads in custom format and adds utility data
Repo: NREL/openstudio-calibration-gem
download AddMonthlyUtilityData
Tariff Selection-Flat Ruby measure This measure sets flat rates for electricity, gas, water, district heating, and district cooling.
Repo: NREL/openstudio-common-measures-gem
download Tariff Selection-Flat
XcelEDATariffSelectionandModelSetup Ruby measure Add the selected Xcel utility rate, as well as set the timestep and lifecycle costing parameters as required by the Xcel EDA program.
Repo: NREL/openstudio-common-measures-gem
download XcelEDATariffSelectionandModelSetup
Tariff Selection-Generic Ruby measure This measure will add pre defined tariffs from IDF files in the resrouce directory for this measure.
Repo: NREL/openstudio-common-measures-gem
download Tariff Selection-Generic
SetLifecycleCostParameters Ruby measure This measure sets the analysis type to "FEMP" and has an argument for the length of the study period in years.
Repo: NREL/openstudio-common-measures-gem
download SetLifecycleCostParameters
Add Cost per Floor Area to Unused Lights Ruby measure This measure is the same as 'Add Cost per Floor Area to Electric Lights' except that it only offers lights definitions that are not used in the model.
Repo: NREL/openstudio-common-measures-gem
download Add Cost per Floor Area to Unused Lights
Tariff Selection-Time and Date Dependant Ruby measure This measure sets flat rates for gas, water, district heating, and district cooling but has on seasonal and off peak rates for electricity. It exposes inputs for the time of day and day of year where peak rates should be applied.
Repo: NREL/openstudio-common-measures-gem
download Tariff Selection-Time and Date Dependant
Tariff Selection-Block Ruby measure This measure sets block rates for electricity, and flat rates for gas, water, district heating, and district cooling.
Repo: NREL/openstudio-common-measures-gem
download Tariff Selection-Block
Add Cost per Floor Area to Building Ruby measure This measure will create life cycle cost objects associated with a the building. You can set a material and installation cost, demolition cost, and O&M costs. Optionally existing cost objects already associated with building can be deleted. This measure will not affect energy use of the building.
Repo: NREL/openstudio-common-measures-gem
download Add Cost per Floor Area to Building
Add Cost per Area to Unused Construction Ruby measure This measure is the same as 'Add Cost per Area to Construction' except that it only offers constructions that are not used on any surfaces in the baseline construction.
Repo: NREL/openstudio-common-measures-gem
download Add Cost per Area to Unused Construction
Add Cost per FloorArea to Lights Ruby measure This measure will create life cycle cost objects associated with lights. You can choose any light definition used in the model that has a watt/area power. You can set a material & installation cost, demolition cost, and O&M costs. Optionally existing cost objects already associated with the...
Repo: NREL/openstudio-common-measures-gem
download Add Cost per FloorArea to Lights
Add Cost per Area to Construction Ruby measure This measure will create life cycle cost objects associated with the selected construction. You can set a material and installation cost, demolition cost, and O&M costs. Optionally existing cost objects already associated with building can be deleted. This measure will not affect energy use of...
Repo: NREL/openstudio-common-measures-gem
download Add Cost per Area to Construction
Add Cost to Supply Side HVAC Component by Air Loop Ruby measure This will add cost to HVAC components of a specified type in the selected air loop(s). It can run on all air loops or a single air loop. This measures only adds cost and doesn't alter equipment performance
Repo: NREL/openstudio-common-measures-gem
download Add Cost to Supply Side HVAC Component by Air Loop
Add Cost per Floor Area to Electric Equipment Ruby measure This measure will create life cycle cost objects associated with electric equipment. You can choose any electric equipment definition used in the model that has a watt/area power. You can set a material and installation cost, demolition cost, and O&M costs. Optionally existing cost objects...
Repo: NREL/openstudio-common-measures-gem
download Add Cost per Floor Area to Electric Equipment