Search Results

Results 1 to 25 out of 35

Name Type Description Download
Set Electric Equipment loads by EPD Ruby measure Set the electric equipment power density (W/ft^2) in the to a specified value for all spaces that have electric equipment. This can be applied to the entire building or a specific space type. Cost can be added per floor area
Repo: NREL/openstudio-common-measures-gem
download Set Electric Equipment loads by EPD
Add_EV_Load Ruby measure This measure adds a load associated with charging of electric vehicles (EVs) to a building in URBANopt. EV load profiles were generated in EVI-Pro for specific building types. This measure allows running of customized load profiles for buildings in the Pena Station Next project, and also for...
Repo: NREL/openstudio-common-measures-gem
download Add_EV_Load
Reduce Electric Equipment Loads by Percentage Ruby measure Reduce Electric Equipment Loads by Percentage Reduce electric equipment loads. This will affect equipment that have a, power, power per area (LPD), or power per person value. This can be applied to the entire building or a specific space type. A positive percentage...
Repo: NREL/openstudio-ee-gem
download Reduce Electric Equipment Loads by Percentage
AedgK12ElectricEquipment Ruby measure This measure removes all existing electric equipment from spaces recognized as primary or secondary school space types. One exception is that loads assigned directly to a space whre the load definition contains "Elev" or "elev" will be left alone. New electric equipment will be added based on...
Repo: NREL/openstudio-aedg-gem
download AedgK12ElectricEquipment
AedgSmallToMediumOfficeElectricEquipment Ruby measure This measure removes all existing electric equipment from spaces recognized as office building space types. New electric objects will be added based on the 50% Small to Medium Office AEDG recommendations.
Repo: NREL/openstudio-aedg-gem
download AedgSmallToMediumOfficeElectricEquipment
ZEDG K12 ElectricEquipment Ruby measure This measure removes all existing electric equipment from spaces recognized as primary or secondary school space types. One exception is that loads assigned directly to a space where the load definition contains "Elev" or "elev" will be left alone. New electric equipment will be added based on...
Repo: NREL/openstudio-aedg-gem
download ZEDG K12 ElectricEquipment