Set Electric Equipment loads by EPD

Measure Details

NameSet_electric_equipment_loads_by_epd
Display NameSet Electric Equipment Loads By Epd
uuidb1d87b95-a6d1-4999-bd0d-16da879f4340
TypeMeasure
Language Ruby
Tags Equipment.Electric Equipment
DescriptionSet the electric equipment power density (W/ft^2) in the to a specified value for all spaces that have electric equipment. This can be applied to the entire building or a specific space type. Cost can be added per floor area
Modeler's DescriptionDelete all of the existing electric equipment in the model. Add electric equipment with the user defined electric equipment power density to all spaces that initially had electric equipment, using the schedule from the original electric equipment. If multiple electric equipment existed the schedule will be pulled from the one with the highest electric equipment power density value. Demolition costs from electric equipment removed by this measure can be included in the analysis.
Measure FunctionMeasure
Requires EnergyPlus Resultsfalse
Uses SketchUp APIfalse
Measure TypeModelMeasure
OpenStudio Version2.0.0
Minimum Compatible OpenStudio Version2.0.0
README FileREADME.md
GitHub RepoNREL/openstudio-common-measures-gem

Versions

Version ID GitHub Release Tag OpenStudio Version Min Compatible Version Max Compatible Version Download Link
82ce2fa6-e066-4dd0-adba-9b7338ed0757 v0.9.0 2.0.0 2.0.0 Download v0.9.0
82ce2fa6-e066-4dd0-adba-9b7338ed0757 v0.8.0 2.0.0 2.0.0 Download v0.8.0
be45836d-f09d-4a03-986f-0aa886657f16 v0.6.1 2.0.0 2.0.0 Download v0.6.1
be45836d-f09d-4a03-986f-0aa886657f16 v0.6.0 2.0.0 2.0.0 Download v0.6.0
be45836d-f09d-4a03-986f-0aa886657f16 v0.5.0 2.0.0 2.0.0 Download v0.5.0
77eb1d04-16e0-48eb-9cb5-e43c99d8252d v0.1 2.0.0 2.0.0 Download v0.1